TRAFFIC & TRANSPORTATION

SOLUTIONS: Base Model for South Mumbai Redevelopment

 

CLIENT: Municipal Corp. of Greater Mumbai

 

PERIOD: 2012

 

DESCRIPTION: Detailed Surveys & Developed Micro Simulation Model, Area from Metro Cinema and CST Station to Regal Chowk and Nariman Point in South Mumbai.

 

STUDY INCLUDES: Pedestrian Infrastructure, Potential Parking lot locations, pedestrianization iniatives, route optimization, road closing etc

mumbai.jpg

PEDESTRIAN MOBILITY PLANNING

SOLUTIONS: Metro Station Capacity Testing, Management of Traffic Intersection

 

CLIENT: Mumbai Metropolitan Regional Development Authority

 

PERIOD: 2013

 

DESCRIPTION: Management of Boarding and alighting passengers at busy metro stations and their integration with Public, Private Trasnport.

 

STUDY INCLUDES: Design Testing & optimization, Dispersal, Public Realm Integration, Crowd Management, Capacity Testing, Vertical Simulation, Evacuation Planning

mumbai3.webp

NETWORK & CORRIDOR LEVEL SOLUTIONS

SOLUTIONS: Infrastructure Development Options and Configuration Analysis and Corridor Improvement

 

CLIENT: Maharahstra State Road Development Corporation

 

PERIOD: 2011

 

DESCRIPTION: Micro & 3D Simulation Model of Western Traffic Corridor includes the Bandra Worli Sea Link and Haji Ali & Cadbury Junctions.

 

STUDY INCLUDES: Network Optimization & Decongestion, Signal Synchronisation, Road Widening, Junction Improvement

msrdc.jpg

PEDESTRIAN EVACUATION PLANNING

SOLUTIONS: Disaster Management Simulation Framework

 

CLIENT: Disaster Management Cell

 

PERIOD: 2013

 

DESCRIPTION: Detailed analysis of evacuation performance of a critical public building conducted. MST was able to develop an evacuation protocol with non structural design changes and minor operational changes to achieve a 30 % reduction in overall evacuation time.

disaster.jpg

SUSTAINABLE TRANSPORT

SOLUTIONS: Pedestrianization

 

CLIENT: Mumbai Traffic Police and Mumbai Transformation Support Unit

 

PERIOD: 2012

 

DESCRIPTION: Evaluation & Optimize an option for creation of a pedestrian only area near the Jehangir Art gallery and National Gallery of Modern Art at Regal Chowk in Mumbai. Introduction of new signals, Traffic rerouting, changes in the existing phases, modified bus movement and traffic performance were scrutinized as part of the study.

traffic.jpg

TRANSIT

SOLUTIONS: Bus Rapid Transit System design evaluation, operations optimization & Testing

 

CLIENT: Bhopal Municipal Corporation & Egis

 

PERIOD: 2010

 

DESCRIPTION: MST modelled the upcoming Bhopal Bus Rapid Transit System ( Micro Simulation as well as 3D), Study included- Bus Stop Locations, evaluation of vehicle actuated signals, Signal Optimization, merging management. The analysis received appreciation that year from Dario Hidalgo (Father of BRT) at the Urban Mobility Conference later that year.

BHOPAL.png

REAL ESTATE DEVELOPMENT

SOLUTIONS: Public Parking Lot- Demand & Traffic Impact

 

CLIENT: Municipal Corporation of Greater Mumbai & Piramal

 

PERIOD: 2013

 

DESCRIPTION: Detailed Parking Demand Assessment and Future Traffic Impact A assessment for upcoming 50+story residential development project. Analysis included simulation modelling as well as probabilistic analysis and projection for future parking demand based in comprehensive surveys.

mumbai.jpg

PEDESTRIAN EVACUATION PLANNING

SOLUTIONS: Disaster Management Simulation Framework

 

CLIENT: Disaster Management Cell

 

PERIOD: 2013

 

DESCRIPTION: Detailed analysis of evacuation performance of a critical public building conducted. MST was able to develop an evacuation protocol with non structural design changes and minor operational changes to achieve a 30 % reduction in overall evacuation time.

disaster.jpg